Trip distribution
In the Trip Distribution section of a travel estimate's details, spreading trips is just like spreading hours/units/cost in a resource estimate's details. After you enter the trip amount, Contractor Essentials distributes the trips within the specified time frame using the spread curve you select.
Amount and curve
Use the Amount and Curve fields to control the distribution of trips in a task.
Amount | Enter the number times the trip will be taken. If you discretely enter trips in months or years, this field is disabled. |
Curve | A spread curve is optional, but this field cannot be blank. Load: Spread the total amount in every month or year. (None): No spread curve. Trips must be entered discretely. ...(System): System-defined curve in Contractor Essentials. The curve name reflects the curve shape (for example, 05/95 spreads 5% of the total amount at the start and 95% over the end). |
Start date, end date, and duration
Start Date & End Date | The spread period start date and end date are required. The default spread dates match the task's PoP. You can change the start date and end date, but the spread period must be within the task's PoP. |
Duration | The spread duration is calculated automatically according to the start date and end date. It is the number of months in the spread period. |
Months and years
The proposal's timescale affects the distribution of trips. This example shows trips discretely entered in a monthly proposal.
And this example shows the same amount of trips evenly spread in an annual proposal.
For assistance with Contractor Essentials, please visit the Deltek Support Center